Does Visual Studio 2015 RC work in parallel with Visual Studio 2013 -


i'm having question since month , i'm not able test it, want ask here if have met situation. since there no official release of new visual studio 2015 , it's on rc ,i'm interested in know if vs 2015 , vs 2013 work together? code "infected" if both sides commit together? in advance!

in theory yes, in practice no (or @ least results may vary). vs designed side side installations. consultants common have multiple versions of vs installed match environment of client.

that being said, rc pre release software , bugs expected. nobody can guarantee won't have problems. vs huge , complex codebase. throw in number of permutations of possible plugins , extensions environment conditions , there chance of breaking. because didn't blow on else's system doesn't mean won't have problems.

when installed vs 2015 ctp6 few months ago broke install of vs 2013 on same machine. vs 2015 ctp6 installed without error trying "login" (microsoft's new annoying way infect software user login) hung , became unresponsive. upon restart devenv.exe complained corrupted user settings , before tried had bad feeling vs 2013 blew well. right , took reinstall working.

now on other hand installed vs 2015 rc side side on machine vs 2010, 2012 , 2013 without issue. mean guaranteed not have problem? of course not. pre-release software. if mission critical machine , don't have time potentially spend few hours reinstalling vs 2013 install in vm. if isn't mission critical or have time reinstall if necessary roll dice. "should" fine, rc pretty stable never know.


Comments

Popular posts from this blog

c++ - Difference between pre and post decrement in recursive function argument -

php - Nothing but 'run(); ' when browsing to my local project, how do I fix this? -

php - How can I echo out this array? -